Construction report from the farm

Posted on 05/09/13 in Uncategorized, No Comments

septitank 9 maj

15-20 men are working daily on construction at the farm. The bottom piece for the second floor will be poured, the kitchen walls are starting to take shape, and the floor for the dining room is finished.

The septic tank area is also being dug out, approximately 10 x 4 meters – and 15 meters deep. All done by hand!

See the construction page for more pictures.

Post a Comment

Your email is never published or shared. Required fields are marked *