Still on Water!

Posted on 07/28/11 in Lydia, No Comments

Yesterday we started connecting pipes from the main water connection and the work is
still going on..

1311856699
The pipe has been connected by the plumber and workers are filling the trench with soil.

1311857305
The plumber connecting pipes!

1312376369
Water pipe being connected inside the farm!

Post a Comment

Your email is never published or shared. Required fields are marked *